[et_pb_section bb_built=”1″ _builder_version=”3.0.47″][et_pb_row _builder_version=”3.0.47″ background_size=”initial” background_position=”top_left” background_repeat=”repeat”][et_pb_column type=”4_4″][et_pb_text admin_label=”Header” _builder_version=”3.0.89″]
Moorage Rate Study
[/et_pb_text][et_pb_text _builder_version=”3.0.89″ background_layout=”light”]
The Port of Kingston Port has retained BST Associates to conduct a comparison
study of the Port’s moorage rates to similarly-sized public ports on the Sound. The study is
expected to take several months and will include both daytime and evening public meetings. If
the Commissioners adopt their recommendations, it would affect permanent moorage rates in
2019.
Please continue to check this page, as any information related to the study including the meeting schedule will be posted here.
- BST Associates PowerPoint Presentation – presented at the August 22, 2018 Regular Commission Meeting (before the rate study)
- Community Conversations on Moorage Rates – Public Meeting Calendar (all meeting dates can be found on the Port calendar as well)
- BST Associates PowerPoint Presentation (results of the rate study) – presented at the October 4, 2019 Special Commission Meeting
- October 2018 Port of Kingston News – includes a summary of BST Associate’s moorage rate proposal
[/et_pb_text][/et_pb_column][/et_pb_row][/et_pb_section]